Description of Work : The Electrical Installation at the above project was carried out while the church was still in operation with little or no disturbance. A major part of the works was the Public Address / Audio Visual Installation. The installation of the high-level colour changing lights was quite an endeavour due to the nature of the existing building. The church was completely stripped back to the bare structure with the flooring and internal finishes all removed and reinstated.

 

The Electrical services involved the following systems:-

 

* Mains & Sub Power Distribution

* General & Emergency Lighting

* External Lighting Installation

* General Purpose Power

* Fire Alarm Installation

* Intruder Alarm/CCTV Installation

* PA/AV System Installation

* Disabled Toilet Alarm System

* Deaf Loop System

* Data Cabling Installation

* Mechanical Services Wiring

* TV Installation

* Door Access System Installation

* Lightning Protection Installation